Application Case · mining wear protection

Coal Bunker De-Arching with UHMWPE Liner

Power plant coal bunker arching events dropped from weekly to zero after 20mm UHMWPE retrofit.

Discuss Your Project

Background

An Asian thermal power plant was suffering weekly arching events in the coal bunkers feeding pulverizers. When an arch formed, operators had to use vibrators and (occasionally) air cannons to restore flow. Repeated cannon firing damaged bunker steel.

Retrofit

Result

Arching events: zero in the first 18 months post-installation. Air cannons removed from the bunker (no longer needed). Vibrator energy use down ~80 %. Bonus: noise from coal flowing reduced by ~12 dB at the bunker base — improvement noted by control-room operators.

Recommended Products for This Application

UHMWPE Silo & Bin Liners (Anti-Bridging)

UHMWPE Silo & Bin Liners (Anti-Bridging)

Anti-bridging UHMWPE liner sheets for storage silos, bins, and hoppers — flow-promoting design.

View product →
UHMWPE Chute & Hopper Liners

UHMWPE Chute & Hopper Liners

Wear-resistant UHMWPE liner sheets for ore chutes, transfer chutes, and bulk hoppers.

View product →

Request a Quotation

Tell us about your mining wear protection project. Our engineering team responds within 12 hours with technical specs, lead time and a tailored quotation.

Part of the JSLT Global Manufacturing Network · jslt-polymers.com jspolymers.com plasticos-ingenieria.com
© Dezhou Jiasheng Rubber & Plastic Products · SGS / FDA / RoHS verified · 80+ countries
FOB Qingdao · MOQ from 1 piece · Quote in 24h · claire@jsltupe.com