📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · FOB Qingdao
Home›Blog›How to Install Mining Chute Liners with Counter-Bored Bolting
How-to Guide · JSLT Mining

How to Install Mining Chute Liners with Counter-Bored Bolting

Practical step-by-step guide based on field experience. Send your DWG and we quote within 24 hours.

Overview

This guide covers the practical steps to install mining chute liners with counter-bored bolting. JSLT Mining produces engineering plastic components in UHMWPE, HDPE, PA, POM and PTFE — full-process fabrication from raw sheet to CNC-machined parts.

Step-by-step procedure

  1. Survey chute geometry. Map chute walls; record corners, transitions, and bolt access.
  2. Lay out liner panels. Plan panels to maximize size while allowing access for bolting.
  3. Drill counter-bores. Counter-bore liners 1.5× bolt-head diameter for thermal expansion.
  4. Bolt with washers. Mechanical fastening using stainless M12–M16 with large flat washers.
  5. Inspect first wear cycle. Tighten any loose bolts after 100 operating hours.

Need help?

Our engineering team reviews drawings within 24 hours. We have shipped to 80+ countries across 4 continents and hold ISO 9001 certification.

Get a Quote in 24 Hours

Send your DWG/DXF/PDF/STEP files to claire@jsltupe.com — we reply within 24 h with unit cost, lead time, and FOB Qingdao shipping option.

📧 claire@jsltupe.com · ☎ +86 189 6300 3803 · MOQ from 1 piece · Quote on request

Contact Us